Milk Parlor / Dairy Processing
Rupert, ID
Size: 14,600 sf
Duration: 7 Months
Complete design/build addition to an existing structure adding over 14,000 sf of split level milk processing plant. Facility has 76 milking stations and is fully water tight with plastic covered walls and ceiling with a chemical resistant epoxy coating on the walls for added durability. Project also included a sand/sludge separator for the lagoon area where solids can easily be removed from process water.