Design / Build
Suntado Warehouse
Project Overview
This accelerated schedule project was needed to support the new outputs of the Suntado Plant just down the road. We gave them a full turn-key, design / build approach and got moving on construction within a month of concept. This facility is climate controlled and houses 7,830 pallets of finished product for distribution.
Project Details
- Category Design / Build
- Location Burley, ID
- Size 56,991 sf
- Duration 8 Months