Project Overview

Pre-engineered metal building for storage of feed commodities. Interior and exterior walls are designed to be loaded with product.

Project Details

  • Category Agricultural
  • Location Gooding, ID
  • Size 66,800
  • Duration 9 months
Start Your Project