Design / Build
Tilt-Up Large Warehouse Complex
Project Overview
Concrete tilt-up building with only 1 column for the 128' width and 6 semi truck loading docks. Complete overhaul of the existing site as well as coordination with the water district and rail spur entities for relocations. This site can handle 3 phases of construction with 2 being completed.
Project Details
- Category Design / Build
- Location Rupert, ID
- Size 96,000 sf
- Duration 9 Months