Project Overview

Concrete tilt-up building with only 1 column for the 128' width and 6 semi truck loading docks. Complete overhaul of the existing site as well as coordination with the water district and rail spur entities for relocations. This site can handle 3 phases of construction with 2 being completed.

Project Details

  • Category Design / Build
  • Location Rupert, ID
  • Size 96,000 sf
  • Duration 9 Months
Start Your Project